50ml Cartridge Filling

How Many (2-Part) Cartridges do I need to be filling to Justify an Automated Filling System?

Posted

How many cartridges do I need to be filling to justify an automated filling system?

Small 2-component cartridges.

This is a question we are asked by Adhesive Manufacturers and Toll Fillers alike, and there are various considerations to be made, so rather than trying to answer it definitively we thought it would be better to offer a comparison across different scenarios and let you be the judge.

The comparison will be between a Semi-automatic Filling System, and an Automatic Filling System, based on Smaller-sized 2-component cartridges (.e.g. 50, 25, 10mls).

Typically with small cartridges, the machine cost will vary depending on whether the Adhesive can be gravity fed (lower viscosity), or whether some positive pressure is needed (higher viscosity) – so we have given scenarios for both; first scenarios 1 to 10 for a lower viscosity marked with (LV), and then scenarios 1 to 10 for a higher viscosity marked with (HV)

Throughout the scenarios some items remain fixed, and some vary

Fixed items

1) The spec, output, and cost of the equipment

  • Semi-automatic system (LV) consisting of a Semi-automatic Cartridge Filling Machine and a Semi-automatic Piston Insertion Station, each typically giving an output of 6 cartridges a minute, but each requiring an operator. At a cost of £22,000 GBP
  • Semi-automatic system (HV) consisting of a Semi-automatic Cartridge Filling Machine and a Semi-automatic Piston Insertion Station, each typically giving an output of 6 cartridges a minute, but each requiring an operator. At a cost of £50,000 GBP
  • Automated Cartridge Filling System (LV), capable of giving an output of 20 cartridges a minute. Only requiring one operator. At a cost of £222,000
  • Automated Cartridge Filling System (HV), capable of giving an output of 20 cartridges a minute. Only requiring one operator. At a cost of £250,000

2) The Cost of labor – £10 Per Hour.

3) The Time Periods – in years

Variable items

1) The demand i.e., the number of cartridges that must be filled in a year.

2) The number of shifts that can be put on.

Caveats

For the purposes of this example we needed to settle on a finite time period the machine would be running for, so we chose 10 years (this is not an indication of the total service life of any equipment).

Both equipment cost, and outputs will vary both up and down, depending on the configuration and cartridge size (the prices and output chosen are fair averages rather than definitive).

Abbreviations

  • Semi-Automatic Cartridge Filling System – Semi-auto
  • Automatic Cartridge Filling System – Automatic
  • System for Lower viscosity – (LV)
  • System for Higher viscosity – (HV) 

Point to remember

  • To achieve 6 Cartridges per minute with the Semi-auto 2 Operators are required.
  • To achieve 20 Cartridges per minute with the Automatic 1 Operator is required.

 

(LV) Scenarios

 

(LV) Scenario 1 – 200,000 cartridges a year

Semi-Auto outlay of 22,000 GBP

Manhours required – 1,111

Cost of Equipment and labor over 10 years

133,100

Automatic outlay of 222,000 GBP

Manhours required – 167

Cost of Equipment and labor over 10 years

238,000

 

(LV) Scenario 2 – 400,000 cartridge a year (at this point a second shift or second machine would be required on Semi-auto)

(2nd shift)

Semi-Auto outlay of 22,000 GBP

Manhours required – 2,222

Cost of Equipment and labor over 10 years

244,200

 

Automatic outlay of 222,000 GBP

Manhours required – 333

Cost of Equipment and labor over 10 years

255,300

(2nd machine)

Semi-Auto outlay of 44,000 GBP

Manhours required – 2,222

Cost of Equipment and labor over 10 years

266,200

 

 

(LV) Scenario 3 – 600,000 cartridges a year

(2nd shift)

Semi-Auto outlay of 22,000 GBP

Manhours required – 3,333

Cost of Equipment and labor over 10 years

355,300

 

Automatic outlay of 222,000 GBP

Manhours required – 500

Cost of Equipment and labor over 10 years

272,000

(2nd machine)

Semi-Auto outlay of 44,000 GBP

Manhours required – 3,333

Cost of Equipment and labor over 10 years

377,300

 

 

(LV) Scenario 4 – 800,000 cartridges a year (at this point a third shift or a third machine would be required on Semi-auto)

(3rd shift)

Semi-Auto outlay of 22,000 GBP

Manhours required – 4,444

Cost of Equipment and labor over 10 years

466,400

 

Automatic outlay of 222,000 GBP

Manhours required – 667

Cost of Equipment and labor over 10 years

288,700

(3rd machine)

Semi-Auto outlay of 66,000 GBP

Manhours required – 4,444

Cost of Equipment and labor over 10 years

510,400

 

 

(LV) Scenario 5 – 1,000,000 cartridges a year

(3rd shift)

Semi-Auto outlay of 22,000 GBP

Manhours required – 5,556

Cost of Equipment and labor over 10 years

577,600

 

Automatic outlay of 222,000 GBP

Manhours required – 833

Cost of Equipment and labor over 10 years

305,300

(3rd machine)

Semi-Auto outlay of 66,000 GBP

Manhours required – 5,556

Cost of Equipment and labor over 10 years

621,600

 

 

(LV) Scenario 6 – 1,200,000 cartridges a year (at this point a second machine and second shift, or a fourth machine would be required on Semi-auto)

(2nd machine and 2nd shift)

Semi-Auto outlay of 44,000 GBP

Manhours required – 6,667

Cost of Equipment and labor over 10 years

710,700

 

Automatic outlay of 222,000 GBP

Manhours required – 1,000

Cost of Equipment and labor over 10 years

322,000

(4th machine)

Semi-Auto outlay of 88,000 GBP

Manhours required – 6,667

Cost of Equipment and labor over 10 years

754,700

 

 

(LV) Scenario 7 – 1,400,000 cartridges a year

(2nd machine and 2nd shift)

Semi-Auto outlay of 44,000 GBP

Manhours required – 7,778

Cost of Equipment and labor over 10 years

821,800

 

Automatic outlay of 222,000 GBP

Manhours required – 1,167

Cost of Equipment and labor over 10 years

338,700

(4th machine)

Semi-Auto outlay of 88,000 GBP

Manhours required – 7,778

Cost of Equipment and labor over 10 years

865,800

 

 

(LV) Scenario 8 – 1,600,000 cartridges a year (at this point a second machine and third shift, or a fifth machine would be required on Semi-auto)

(2nd machine and 3rd shift)

Semi-Auto outlay of 44,000 GBP

Manhours required – 8,889

Cost of Equipment and labor over 10 years

932,900

 

Automatic outlay of 222,000 GBP

Manhours required – 1,333

Cost of Equipment and labor over 10 years

355,300

(5th machine)

Semi-Auto outlay of 110,000 GBP

Manhours required – 8,889

Cost of Equipment and labor over 10 years

998,900

 

 

(LV) Scenario 9 – 1,800,000 cartridges a year

(2nd machine and 3rd shift)

Semi-Auto outlay of 44,000 GBP

Manhours required – 10,000

Cost of Equipment and labor over 10 years

1,044,000

 

Automatic outlay of 222,000 GBP

Manhours required – 1,500

Cost of Equipment and labor over 10 years

372,000

(5th machine)

Semi-Auto outlay of 110,000 GBP

Manhours required – 10,000

Cost of Equipment and labor over 10 years

1,110,000

 

 

(LV) Scenario 10 – 2,000,000 cartridges a year (at this point a third machine and second shift, or a sixth machine would be required on Semi-auto)

(3rd machine and 2nd shift)

Semi-Auto outlay of 66,000 GBP

Manhours required – 11,111

Cost of Equipment and labor over 10 years

1,177,100

 

Automatic outlay of 222,000 GBP

Manhours required – 1,667

Cost of Equipment and labor over 10 years

388,700

(6th machine)

Semi-Auto outlay of 132,000 GBP

Manhours required – 11,111

Cost of Equipment and labor over 10 years

1,243,100

 

 

(HV) Scenarios 

 

(HV) Scenario 1 – 200,000 cartridges a year

Semi-Auto outlay of 50,000 GBP

Manhours required – 1,111

Cost of Equipment and labor over 10 years

161,100

Automatic outlay of 250,000 GBP

Manhours required – 167

Cost of Equipment and labor over 10 years

266,700

 

(HV) Scenario 2 – 400,000 cartridge a year (at this point a second shift or second machine would be required on Semi-auto)

(2nd shift)

Semi-Auto outlay of 50,000 GBP

Manhours required – 2,222

Cost of Equipment and labor over 10 years

272,200

 

Automatic outlay of 250,000 GBP

Manhours required – 333

Cost of Equipment and labor over 10 years

283,300

(2nd machine)

Semi-Auto outlay of 100,000 GBP

Manhours required – 2,222

Cost of Equipment and labor over 10 years

322,200

 

 

(HV) Scenario 3 – 600,000 cartridges a year

(2nd shift)

Semi-Auto outlay of 50,000 GBP

Manhours required – 3,333

Cost of Equipment and labor over 10 years

383,300

 

Automatic outlay of 250,000 GBP

Manhours required – 500

Cost of Equipment and labor over 10 years

300,000

(2nd machine)

Semi-Auto outlay of 100,000 GBP

Manhours required – 3,333

Cost of Equipment and labor over 10 years

433,300

 

 

(HV) Scenario 4 – 800,000 cartridges a year (at this point a third shift or a third machine would be required on Semi-auto)

(3rd shift)

Semi-Auto outlay of 50,000 GBP

Manhours required – 4,444

Cost of Equipment and labor over 10 years

494,400

 

Automatic outlay of 250,000 GBP

Manhours required – 667

Cost of Equipment and labor over 10 years

316,700

(3rd machine)

Semi-Auto outlay of 150,000 GBP

Manhours required – 4,444

Cost of Equipment and labor over 10 years

594,400

 

 

(HV) Scenario 5 – 1,000,000 cartridges a year

(3rd shift)

Semi-Auto outlay of 50,000 GBP

Manhours required – 5,556

Cost of Equipment and labor over 10 years

605,600

 

Automatic outlay of 250,000 GBP

Manhours required – 833

Cost of Equipment and labor over 10 years

333,300

(3rd machine)

Semi-Auto outlay of 150,000 GBP

Manhours required – 5,556

Cost of Equipment and labor over 10 years

705,600

 

 

(HV) Scenario 6 – 1,200,000 cartridges a year (at this point a second machine and second shift, or a fourth machine would be required on Semi-auto)

(2nd machine and 2nd shift)

Semi-Auto outlay of 100,000 GBP

Manhours required – 6,667

Cost of Equipment and labor over 10 years

766,700

 

Automatic outlay of 250,000 GBP

Manhours required – 1,000

Cost of Equipment and labor over 10 years

350,000

(4th machine)

Semi-Auto outlay of 200,000 GBP

Manhours required – 6,667

Cost of Equipment and labor over 10 years

866,700

 

 

(HV) Scenario 7 – 1,400,000 cartridges a year

(2nd machine and 2nd shift)

Semi-Auto outlay of 100,000 GBP

Manhours required – 7,778

Cost of Equipment and labor over 10 years

877,800

 

Automatic outlay of 250,000 GBP

Manhours required – 1,167

Cost of Equipment and labor over 10 years

366,700

(4th machine)

Semi-Auto outlay of 200,000 GBP

Manhours required – 7,778

Cost of Equipment and labor over 10 years

977,800

 

 

(HV) Scenario 8 – 1,600,000 cartridges a year (at this point a second machine and third shift, or a fifth machine would be required on Semi-auto)

(2nd machine and 3rd shift)

Semi-Auto outlay of 100,000 GBP

Manhours required – 8,889

Cost of Equipment and labor over 10 years

988,900

 

Automatic outlay of 250,000 GBP

Manhours required – 1,333

Cost of Equipment and labor over 10 years

383,300

(5th machine)

Semi-Auto outlay of 250,000 GBP

Manhours required – 8,889

Cost of Equipment and labor over 10 years

1,138,900

 

 

(HV) Scenario 9 – 1,800,000 cartridges a year

(2nd machine and 3rd shift)

Semi-Auto outlay of 100,000 GBP

Manhours required – 10,000

Cost of Equipment and labor over 10 years

1,100,000

 

Automatic outlay of 250,000 GBP

Manhours required – 1,500

Cost of Equipment and labor over 10 years

400,000

(5th machine)

Semi-Auto outlay of 250,000 GBP

Manhours required – 10,000

Cost of Equipment and labor over 10 years

1,250,000

 

 

(HV) Scenario 10 – 2,000,000 cartridges a year (at this point a third machine and second shift, or a sixth machine would be required on Semi-auto)

(3rd machine and 2nd shift)

Semi-Auto outlay of 150,000 GBP

Manhours required – 11,111

Cost of Equipment and labor over 10 years

1,261,100

 

Automatic outlay of 250,000 GBP

Manhours required – 1,667

Cost of Equipment and labor over 10 years

416,700

(6th machine)

Semi-Auto outlay of 300,000 GBP

Manhours required – 11,111

Cost of Equipment and labor over 10 years

1,411,100

 

 

We have excluded consideration of downstream processes e.g., labeling, boxing-up, and palletizing. And only run the calculations to 2,000,000 cartridges per year.

 

If you would like us to calculate specific scenarios for your situation, please get in touch.

 